
An adaptive reuse project converting a hotel property into multifamily residential — a scope that demanded reconfigured utility infrastructure, new site grading, and coordination with a tight urban lot. Cadoava delivered the sitework package on an aggressive timeline set by the ownership's financing structure.
Urban site constraints in Aurora limited staging area and required careful traffic control throughout construction. Converting hotel utility infrastructure to multifamily standards required detailed coordination with the civil engineer of record and Aurora city utilities for re-permitting, tap fees, and service sizing.
We work with GCs and developers across the Mountain West. Let's talk scope.